Control Plan

Top  Previous  Next

 

 

Overview

 

The control plan tab is only available when an activity is highlighted in the mBOM project tree.  What the control plan allows you to do is add information with regard to the PFMEA's already defined for the activity.    

 

 

 

Figure 1:  Control plan
Figure 1:  Control plan

 

 

The following is a list of the columns located in the Control Plan.  Bolded names represent fields which are user defined.

 

1.Char #
2.Char Description (Products and Process)
3.Spec
4.Imp
5.Type
6.Failure Mode
7.Effects of Failure
8.Severity
9.Cause of Failure
10.Occurrence
11.Prevention
12.Detection
13.Det.
14.RPN
15.Recommending Actions
16.Area of Resp. and Date
17.Actions Taken
18.Sev.
19.Occ.
20.Det.
21.RPN
22.Class
23.Prevention
24.Detection
25.Reaction Plan
26.Tool
27.Gage # Desc. Master
28.Gage R&R Date: Double click twice to bring up a calendar to choose dates from.
29.CP/CPK Target Date
30.Sample Size
31.Frequency