|
Time Estimation
|
Contact Us
Request a Trial
|
|
Select this link
for a 10 minute video presentation
|
|
Proplanner's Time Estimation module organizes your elemental
time data in an easy to use spreadsheet format. Studies can
be referenced within the other Proplanner modules and rolled
up to calculate times for operations, or displayed within
Work Instructions.
Breaking the times into estimated, observed, or calculated
times allows for easy input, independent of what types of
time information your operations already have documented.
You can optionally integrate videos of your work tasks and
perform BOTH observed and predetermined studies (i.e. MTM, Modapts, etc)
from the same video clip and reconcile your results. In addition,
video segments from your time studies are automatically reference-able
within your work instructions.
|



|
Time Estimation Features
Proplanner’s time module accepts the most popular predetermined time standards
such as MTM and MODAPTS, as well as allows users to modify these standards and even
create their own. You can even create your own templates in Excel and import them
into Proplanner for reference by users who are less familiar wirh your coding system.
Proplanner includes an observed time form for entry
and computation of observed work times. Activities
can include both predetermined and observed times.
-
Proplanner processes time data on an activity-by-activity basis so that
companies can use multiple predetermined time standards concurrently. A must
for organizations in transition from one system to another!
|

MTM example shown within the Time Estimation Tab
|
-
In the predetermined time tab, users can select from 1-Line (shown in MODAPTS example)
or 2-Line (shown in MTM example) data entry forms, as well as the paragraph-based
format supported by languages such as MTM-B, where keywords (such as WALK, PROCESS, ASSEMBLE)
and keyword modifiers (such as quantities for Frequency or Time) are uniquely color coded.
Proplanner’s MS Excel-like data entry grids allow for easy insert, delete, cut,
copy and paste functionality.
Gantt charts show the overlap of left hand, right hand, and processing elements
within the overall activity time.
|

BASIC MOST example shown within the Time Estimation Tab
|
Our new MTM-B support, now allows users the ability to estimate activities
using plain language descriptions suitable for shop floor work instruction use.
Users may also import customized time elements for each process, as well as
create formulas that can compute complex machining times.
|
|
Process engineers can enter three different times for each activity in order to
manage Observed Times, Estimated Times and Calculated times concurrently as the
project evolves. The process engineer can also see the Gannt chart for the
activities within the operations.
Users may classify each element as Value Added or Non Value Added time, and
generate pie charts showing waste. In some cases (MTM and MODAPTS) these value
added percentages are automatically generated by Proplanner.
|
|
|
|

View extensive data output in detailed reports |
Time Estimation Benefits
-
Reduce Estimation Time. Using built-in MTM tables and pre-defined time
standards, users can quickly estimate process times from the highly accurate
MTM-1, 4M and MODAPTS standards to the less accurate MTM-B descriptions.
-
Save Money on software. Our integrated time estimation module saves you from
needing to purchase or develop stand-alone predetermined time estimation
systems.
-
Improve the accuracy and consistency of your activity times with user-defined
formulas and look-up tables.
-
Benchmark activities according to lean principles to quickly identify tasks to
focus on for lean improvement.
-
Save money and time by supporting your legacy time standards while
transitioning to new ones. Only Proplanner can work with more than one
predetermined time system concurrently.
-
Share and communicate elemental time definitions with our web-based environment
and XML import/export capabilities.
MTM Support
-
Our predetermined time calculations are supported, and authorized by the North
American MTM Association. Our application currently supports MTM-1, MTM-UAS, 4M
(MMMM) and the newly released MTM-B standards.
-
Our MTM implementations are user configurable. Users may change time values,
and even add additional codes by simply modifying our standard tables in MS
Excel or Notepad.
-
Our new MTM-B parser also computes value-add percentages and makes for an
excellent tool to use in benchmarking lean practices.
-
Our MTM parser includes support for fractional and multiplicative frequency
definition (2x4 instead of 8, or 1/100 to imply 1 out of every 100).
-
In Fall 2003, a walkpath add-on will allow users of AutoCAD and Visio to use
their workplace layouts to automatically generate distances and walkpath
diagrams to our MTM editor.
-
Users can specify machine/fixed based process times (P or T codes) in any unit
that they wish. Proplanner will automatically convert those units into MUs and
show the original time value and associated time unit on the screen and in the
reports.
-
Our MTM1 and 4M standards support the many Special Codes used by the MTM
software applications over the years, including E/I, S/X/M/P, B/C, Dynamic Only
and Within Normal Vision.
MODAPTS Support
-
Our predetermined time calculations are authorized by the International MODAPTS
Association (IMA). Proplanner is a member of the IMA and regularly participates
in the Spring and Fall IMA events.
-
Our MODAPTS parser includes support for fractional and multiplicative frequency
definition (2x4 instead of 8, or 1/100 to imply 1 out of every 100).
Mutiplicative factoring is also allowed within the MODAPTS code sequence. For
Example: M1G1 2(M1P0 L2 W5).
-
Our MODAPTS parser allows users to specify walk distances in paces (W5), feet
(W7.5f) or meters (W2m). The program automatically computes the appropriate
MU’s.
-
In Fall 2003, a walkpath add-on will allow users of AutoCAD and Visio to use
their workplace layouts to automatically generate distances and walkpath
diagrams to our MODAPTS editor.
-
Users can specify machine/fixed based process times (T codes) in any unit that
they wish. Proplanner will automatically convert those units into Mods and show
the original time value and associated time unit on the screen and in the
reports.
|
|