|
Engineers at a truck manufacturing plant used the
Workplace Planner to reduce non value added labor along a
moving line.
Workplace Planner calculated the direct labor of four
operators at each workstation. By Animating the process
steps and walk movements to see and eliminate waste,
engineers were able to improve part presentation and remove
operator delays by 25%. |
 Routing results
after the analysis show a 25% reduction in delay |